Cool?

Bridge construction foreman here
I appreciate what you do, that picture was early stages of planning for replacing of the 1928 bridge at the junction of CA 96 an CA 263. I did all of the geometry, approach and departure design for it. What a fun challenge. The best feeling was during construction the foreman said that they parked a water truck at the end of the bridge and opened the sluice gate and the water went exactly where I had designed it to go! 😁🤘 Google Earth Street view shows it in construction. I love it when I get very few “Awe S#!ts” on a job. Make it Biddable, Buildable, and Driveable. It is even better when I get feedback from the field BEFORE the job is done.
 
Back
Top